Woburn High School
Woburn, Massachusetts

340,000 SF

Annual total energy savings = 25.1%.

Total annual energy cost savings = $ 108,291

Estimated utility incentives = $ 352,778

Measures analyzed include:

High Efficiency Lighting

Daylight Sensor Lighting Controls

Occupancy Sensor Lighting Controls

Demand Ventilation

High Efficiency Condensing Boilers

Kitchen Hood Controls

Hot Water Pump VFD

Window Upgrade

Fuel Cells

 

Whitman-Hanson High School
Whitman, Massachusetts

234,500 SF

Annual total energy savings = 39%.

Total annual energy cost savings = $ 100,160

Estimated utility incentives = $ 440,671

Measures analyzed include:

High Efficiency Lighting

Daylight Sensor Lighting Controls for Classrooms and Cafeteria

Window Upgrade

VAV System with Optimized Controls

Hot and Chilled Water Pump VFDs

Kitchen Hood Controls

Optimized Chiller Plant

Demand Ventilation

High Efficiency Boilers

Renewables: Photovoltaic, Wind Turbine

 

Ashland High School
Ashland, Massachusetts

202,465 SF

Annual total energy savings = 27%

Total annual energy cost savings = $ 76,997

Estimated utility incentives = $ 431,436

Measures analyzed include:

Occupancy Sensor Lighting Controls

Daylight Sensor Lighting Controls for Classrooms and Offices

High Efficiency Lighting

Demand Ventilation

EC Motor for Fan Powered Boxes

Water Cooled Chiller

High Efficiency Boilers

Energy Recovery

Occupancy Based HVAC Controls

Pump VFDs

 Daylight Sensor Lighting Controls for Gym, Cafeteria, Library and Corridors

 

Wachusett Regional High School

Holden, Massachusetts

380,000 SF

Annual total energy savings = 20.7%

Total annual energy cost savings = $ 95,043

Measures analyzed include:

High Efficiency Lighting

Occupancy Sensor Lighting Controls

Daylight Sensor Lghting Controls for Classrooms, Cafeteria, Gym and Lobbies

Demand Ventilation

Energy Recovery for Gymnasium

Enhanced Building Envelope

High Efficiency Roof Top Units

Premium Efficiency Motors

High Efficiency Boilers

 

Click HERE to go back